← Full Scorecard
Musk / the Department of Government Efficiency (DOGE)
TRACKEDBlind spots: 11 / 7
In plain terms
$55 billion claims vs $135 billion disruption Mar 25 live feed: Terafab ($25 billion Austin) launched — Tesla/SpaceX/xAI chip fab. 80% output to orbital data centers (1M satellite constellation filed).
Analysis
$55 billion claims vs $135 billion disruption
Mar 25 live feed: Terafab ($25 billion Austin) launched — Tesla/SpaceX/xAI chip fab. 80% output to orbital data centers (1M satellite constellation filed). Bypasses three engine chokepoints: TSMC fabrication, terrestrial grid, water cooling. 5x solar irradiance in space. Most significant Genesis infrastructure announcement since SMR buildout. However: no operational timeline. The Musk constant: announcement-to-execution gap.